Method Statement for Lotte Center Hanoi Project
Table of Contents
- Project Information
1.1 Project Description
1.1.1 Location
1.1.2 Perspective View
1.1.3 Site Layout
1.1.4 General
1.1.5 Description of Structural System
1.2 Master Schedule
1.3 Overall Project Organization
- Site Logistics
2.1 Logistics Layout
2.1.1 Overall Logistic Plan
2.1.2 Temp Canteen Plan
2.1.3 Phase 1
2.1.4 Phase 2
2.1.5 Phase 3
2.1.6 Phase 4
2.2 Temporary Utility 3. Construction Equipment
- Construction Equipment
3.1 Equipment Mobilization Schedule
3.2 Tower Crane
3.2.1 Tower Crane for Podium & Sub-structure
3.2.2 Tower Crane for Super-structure
3.3 Hoist
3.3.1 Consideration
3.3.2 Hoisting Time Analysis
3.3.3 Hoist Layout
3.3.4 Hoist Schedule
3.3.5 Hoist in Sky garden Area
3.3.6 Hoist Plan for Material
3.4 Concrete Placing Boom
3.4.1 Concrete Pouring Zoning
3.4.2 Concrete Pouring on Lower Part
3.4.3 Concrete Placing Boom
3.4.4 Concrete Quantity by Design Strength
3.4.5 Concrete Pouring Zoning Plan (Tower)
3.4.6Concrete Pouring Considerations
3.4.7 Concrete Pump
3.4.8 Concrete Placing Boom
3.5 Tire Washer
- Construction Plan
4.1 Sub-Structure
4.1.1 Earth work
4.1.2 Structure work
4.1.3 Mat Concrete
4.1.4 Dewatering System
4.2 Superstructure
4.2.1 Form work
4.2.2 Reinforcement Steel
4.2.3 Concrete
4.2.4 Post Tension
4.2.5 Construction Method for Outrigger & Belt Wall
- MEP System
5.1 Organization of mechanical works
5.2 Mechanical system list-up
5.3 Schedule of mechanical works
5.4 Penetration piping works
5.5 Basement piping works
5.6 Aboveground piping works
5.7 Mechanical Rm. Work Plan
5.8 Quality control plan for mechanical works
5.9 Misc. mech.
5.10 Grounding Work Plan
5.11 Penetration Plan
5 12 Inlet Manhole Work Plan
- Safety Plan
6.1 Safety Management Policy and Organization
6.2 Safety Activity On Project Site & Around
6.3 Safety Inspection and Training
6.4 Emergency Measure Plan and Communication System
6.5 Safety Managing Plan In Each Procedure
6.6 General Site Safety
6.7 Safe Access and Fall Protection